在线观看免费播放av片,免费观看在线日韩av片,99精品久久久久久国产人妻,久久精品人妻系列无码专区

NEWS
more>CONTACT US
LATEST NEWSHome >
September 2018 Reach (Beijing) Technology Co., Ltd. won the bidding of Huhhot Metro line 2 project
發(fā)布時(shí)間:2019-12-19

The first phase of Hohhot metro line 2 project was started in 2015 and will be fully constructed from 2016 to 2020. It has a total length of 27.300km, with 24 stations all of which are underground. It is "L" type between the backbone line for connecting the east deputy center, the main centre and south vice center. From the north, it starts at the east of Xindian, and in turn through the Xindian, Baihe road, MCH hospital, Yingzi north, Yijia Village, Genghis khan park, Anstone driving school, Inner Mongolia, and the Stadium, and continuing south, in turn by Tianfu garden, Weather bureau, Hohhot station, Xinhua square (transfer), Hailiang square, institution condoleezza, Jiamao shopping center, Shiqi park, Five camp, South eight zhuang, The south campus of Inner Mongolia university, Shuaijia camp,Refinery living area, lush camp, which are  24 stations.

This project of Hohhot metro line 2 adopts slap-door type ticket checking gate. After fierce competition, our company won the bidding and became the supplier of slap-door type automatic ticket checking gate for Hohhot metro line 2 project.